Principal, Wiss, Janney, Elstner Associates
Since joining WJE in 1997, Ms. Driscoll has developed and/or served as Project Manager for a wide variety of projects including forensic investigation, repair document preparation and oversight during implementation, field performance testing, and building enclosure commissioning (BECx) on a wide range of buildings and structures, including: The $1.5 billion National Geospatial Intelligence Agency East Campus, Fort Belvoir, VA. She was Co-Chair to Dan Lemieux on ASTM Committee E06.55.09, Exterior Enclosure Commissioning and a primary author of the resulting standard ASTM E2813: Standard Practice for Building Enclosure Commissioning. She has authored or co-authored several papers and presentations on the topic of building enclosure design, construction, and performance.